Skip to content
Panel Upgrades · CA Lic. 847255

Panel Upgrades: 200A, 400A, Subpanels Done Properly

Undersized service, Federal Pacific or Zinsco panels, adding a shop or ADU , we size the system correctly, pull the permit, and get the inspection signed off.

Free On-Site Scope

Request A Free On-Site Scope

We call back the same day. No call center, no rotating crew. Steve answers the phone and opens your panel.

Or call (707) 803-6332

A Panel Sized For What Your Property Actually Needs

An undersized electrical panel is the most common reason homes and commercial buildings can’t support modern loads , EV chargers, hot tubs, workshop equipment, HVAC upgrades. Towers EC approaches every panel upgrade the same way: load calculation first, service size decision second, permit pulled before the first wire moves. Steve Torres has upgraded hundreds of panels in Solano County and the North Bay. We’ve never had an inspection fail on our work.

Talk To The Master Electrician
  • Load calculation before any sizing decision: We run the numbers. The panel is sized for your actual load plus reasonable growth.
  • Permit on every panel job: Panel upgrades require permits in every jurisdiction. We pull them. No exceptions.
  • Utility coordination handled: We submit the permit package, coordinate the utility inspection, and manage the sequence.
  • Inspection record provided: You receive documentation of the passed inspection for your records and future sale.

What We Do

Every service we provide comes with the same master electrician standard , CA Lic. 847255, lifetime warranty on install labor, permits pulled, inspections passed.

100A to 200A Upgrade

Most common residential upgrade. Handles modern loads and EV charger readiness.

200A to 400A Upgrade

Large homes, small commercial, multi-unit. Requires utility coordination.

Subpanel Installation

Detached garage, workshop, ADU, barn. Load-calculated, code-compliant.

Federal Pacific / Zinsco Replacement

Recalled or problematic panels replaced with modern, code-approved equipment.

Three-Phase Service

Commercial and light industrial three-phase panel installation and upgrade.

Meter Base and Service Entrance

We handle the full service entrance assembly and utility coordination.

Frequently Asked Questions

How do I know if I need a panel upgrade?

Common signs: breakers that trip regularly, you can’t run multiple appliances at once, you want to add an EV charger or hot tub, your panel is a Federal Pacific or Zinsco brand, or your home was built before 1990 and still has the original panel.

How much does a 200A panel upgrade cost in Vacaville?

Costs vary by service entrance configuration, panel location, and whether the meter base needs updating. We give you a written scope after an on-site walk. Call (707) 803-6332 for a free assessment.

How long does a panel upgrade take?

A standard 100A to 200A residential upgrade typically takes one full day. The power will be off for most of that time. We schedule the utility outage window and work to minimize the downtime.

Will I need to get a permit for a panel upgrade?

Yes, always. Panel work requires a permit and a final inspection in all jurisdictions we serve. We pull the permit, schedule the inspection, and provide you with the signed-off card.

Can I add a subpanel without upgrading my main service?

Possibly. If your main panel has capacity and headroom, a subpanel is straightforward. If it’s already loaded close to its limit, we’ll tell you and recommend the right path.

Power Up Your Project

Talk To A Master Electrician

The person who picks up is the person who shows up. 30+ years of electrical work in Vacaville and the North Bay. CA Lic. 847255. Lifetime warranty on installation labor.

View our project gallery or visit the contact page to schedule a free on-site scope.

What A Panel Upgrade Actually Involves In Vacaville

A panel upgrade is not a part swap. The main panel is where the utility’s power enters your property and gets divided into the branch circuits that feed every room, every outlet, and every appliance. When we upgrade it, we are replacing the main breaker, the bus bars, the breaker positions, and usually the service entrance conductors and the meter base that ties the whole thing to the grid. The work touches the one piece of your electrical system that everything else depends on, which is why we treat the diagnosis as the real job and the swap as the easy part.

The first thing that happens on a panel job is a load calculation. We add up what your property actually draws, the HVAC, the water heater, the range, the dryer, the lighting, plus whatever you plan to add, and we size the service to carry that with margin to spare. A lot of homes in Solano County are still running the 100-amp service they were built with in the seventies and eighties, and that was plenty before central air, EV chargers, and electric ranges showed up. Sizing is where most undersized upgrades go wrong, so we run the numbers before we quote a service size, not after.

When A Homeowner Actually Needs One

You do not upgrade a panel because a website told you to. You upgrade when the panel can no longer carry the load safely or when it is a known fire risk. The clear signs are breakers that trip when two appliances run at once, a panel that runs warm to the touch, scorch marks or a burning smell at the panel, or a brand on the can that the industry has flagged. Federal Pacific Stab-Lok and Zinsco panels are the two big ones, and we replace them often, because their breakers can fail to trip on a fault and leave a live short sitting in your walls.

The other reason is capacity. If you are adding a Level 2 EV charger, a hot tub, a workshop, an ADU, or a heat pump, those are real loads that a maxed-out panel cannot accept. We will tell you honestly whether your existing service has the headroom to add a circuit or a subpanel, or whether the main service genuinely needs to grow. If a subpanel solves it without a full service upgrade, that is what we will recommend. We do not sell amperage you do not need.

The Permit And Inspection Process

Panel work requires a permit and a final inspection in every jurisdiction we serve. There is no version of this job that skips that step, and you should be wary of anyone who offers one. We pull the permit in our own name under CA Lic. 847255, coordinate the utility disconnect and reconnect, and schedule the city or county inspection. The power is off for most of a standard upgrade day, so we set the outage window in advance and work to keep the downtime short.

When the inspector comes out, they are checking that the grounding and bonding are correct, that the service entrance is rated for the load, that the breakers match the wire they protect, and that the whole assembly is built to current code. The job is not closed until the inspector signs off, and we hand you the signed card for your records. That paperwork matters when you sell the home or when an insurer asks about the service, and it is proof the work was done right rather than just done.

Why The Master License Changes The Work

A Master Electrician can pull permits directly, design the service entrance, and stand behind the calculation rather than guessing at it. Three decades on panels means Steve Torres has seen what fails and why: the loose lug that arcs years later, the undersized neutral on a heavy single-phase load, the meter base corroded by coastal air. We size with margin, torque every connection to spec, and label the new panel so the next electrician who opens it understands the system at a glance. That is the difference between a panel that passes inspection on day one and one that is still safe in year thirty.

Every Panel Job

If a single breaker fixes it, you get a single breaker. We size the service to your real load, not to a sales target.

Load CalcBefore any sizing decision
PermitPulled in our name
InspectionScheduled and signed off
LifetimeLabor warranty
Free On-Site Scope